WHS Contractor Management
You can hand over the work. The safety duty stays with you.
Every contractor who walks through your gate is your responsibility too.
Maintenance crews, electricians, cleaners, shutdown teams, labour hire. On most sites, a good share of the people on the floor aren’t on your payroll.
Under WHS law, the duty to keep them safe doesn’t sit only with their employer. It sits with every business that has influence over the work. That includes yours.
Where Contractor Safety Breaks Down
The gaps are rarely dramatic. They’re small things that slip when the site is busy:
- Contractors start work before anyone has checked their insurance, licences or tickets
- SWMS (Safe Work Method Statement) and risk assessments get filed, not read
- A contractor isolates a machine that your maintenance team then restarts, or the other way round
- Nobody knows exactly who's on site when the evacuation alarm goes off
Section 46 of the WHS Act requires every business on a site to consult, cooperate and coordinate with the others. If someone is hurt, “we thought the contractor had it covered” won’t satisfy a regulator.
Test Your Contractor System
With Three Questions
Could you list every contractor on your site right now?
Is your contractor sign-in still a paper book at reception?
Do you check contractor SWMS before work starts, or only after something goes wrong?
If you hesitated on any of these, your contractors are working on trust. Trust isn't a control.
Time to tighten it up.
Contractor Management That Works on a Busy Site
Good contractor management doesn't mean burying a two-hour job in paperwork. It means the right checks for the level of risk, done before the work starts.
Our contractor management service will:
- Set prequalification rules scaled to risk, so a window cleaner and a confined space crew aren't treated the same
- Connect contractor inductions, permits to work and lock-out-tag-out to your own site procedures
- Give your supervisors a simple way to check, monitor and sign off contractor work
How Arnott's Adelaide Fixed It
Arnott’s Biscuits brought GSD Safety in to sort out contractor management and tag-out procedures at its Adelaide site. Outdated processes and poor coordination between departments had opened real gaps.
Moving from paper to a web-based system met resistance at first. Senior leaders got involved, the team ran test phases, and we gave hands-on support on the floor. Six months after rollout, the system was still being followed. Read the Arnott’s case study
The result is a contractor process your supervisors actually use, not a binder nobody opens.
Our Three-Step Approach to Contractor Safety
We follow a contractor job from the first booking to the final sign-off, then fix the points where it breaks down. Our Assess, Align, Assure method keeps that practical, and scales the checks to the risk of the work.
ASSESS
who comes through your gate
ALIGN
your contractor process with the risk
ASSURE
it holds when the site is flat out
Built by Someone Who's Managed Sites Full of Contractors
Rob McDonald has run safety on the ground at a national distribution centre, a major hazard facility and a multi-site food manufacturer. He has also helped major manufacturers tighten up how they manage contractors. He designs systems for the supervisor who has to use them at 6am on a Monday.
Fully Accredited





Contractor Management
Questions Answered
Who is responsible for contractor safety under WHS law?
Both the contractor and the business engaging them. Under the WHS Act, every business with influence over the work holds a duty, and they must consult, cooperate and coordinate with each other. Hiring a contractor shares the risk; it doesn’t hand it over.
What should contractor prequalification include?
At minimum, current public liability and workers compensation insurance, relevant licences and high risk work tickets, and evidence of a safety system that matches the work. Higher-risk work, such as confined spaces or working at heights, warrants deeper checks of SWMS, incident history and supervision.
What's the difference between a SWMS and a JSA?
A SWMS (safe work method statement) is legally required before high risk construction work starts. A JSA (job safety analysis) is a broader tool for breaking any task into steps and controlling the hazards. Many sites use both, depending on the job.
Do contractors need a site induction?
Yes. Contractors need to know your site’s hazards, emergency procedures, isolation rules and who to report to before they start. A short, site-specific induction does that far better than a generic one.
Can contractor management be run digitally?
Yes, and it usually works better. Digital sign-in, prequalification and permits give you a live view of who’s on site and what they’re doing. GSD Safety helped Arnott’s Adelaide make that move from paper and keep it running.